Nintex Connect

The Official Community Site for Nintex Software Products, including Nintex Workflow 2007, 2010 and 2013; Nintex Workflow for Project Server 2010; Nintex Reporting 2008 and Nintex Analytics 2010; Nintex Forms 2010; Nintex Live and Nintex SmartLibrary.
Welcome to Nintex Connect Sign in | Join | Help

Search

You searched for the word(s):
< 1 second(s)
  • Re: Limited Return using the Query List action

    Vadim, I don&#39;t know if you will see new replies to old threads, but I have something to add.&nbsp; I created a test workflow that limits its query to 300 or fewer items on each iteration.&nbsp; It filters so that 1 &lt;= ID &lt; 301, tne next time, 301 &lt;= ID &lt; 601, etc.&nbsp; I had hoped that this would be a workaround, but it ...
    Posted to General Discussion NW2010 (Forum) by ledlincoln on December 4, 2012
  • Re: Limited Return using the Query List action

    I am encountering the same issue in NW 2007, build 11200(?).&nbsp; Is there an update for 2007 that fixes this?
    Posted to General Discussion NW2010 (Forum) by ledlincoln on December 3, 2012
  • Re: Date calculations are wrong

    Never mind, I&#39;m being stupid. 8-o
    Posted to Developer Information (Forum) by ledlincoln on November 28, 2012
  • Date calculations are wrong

    I mentioned this in a previous post, but think I should repost with a pertinent subject line. &nbsp;I have created a simple test workflow.&nbsp; It has workflow variables called LastCalDate and NextCalDate, both of type Date and Time.&nbsp; I have set LastCalDate to 5/1/2012.&nbsp; Then there is a Calculate a Date action which is set to operate ...
    Posted to Developer Information (Forum) by ledlincoln on November 28, 2012
  • Date is wrong

    Never mind that.&nbsp; I deleted the Calculate a Date action and added it back.&nbsp; This time it worked, even though I don&#39;t think I did anything different.&nbsp; &nbsp; HOWEVER, I had it send me NextCalDate in the Notification step, and it is showing 5/1/2013, a full year ahead of&nbsp; LastCalDate.&nbsp; I double checked, and Calculate ...
    Posted to Developer Information (Forum) by ledlincoln on November 27, 2012
  • Calculate a Date fails to publish

    I have a simple workflow that I built just for testing date calculations.&nbsp; I set a workflow variable called LastCalDate to 8/1/2012, then for the second action used Calculate a Date, and entered 6 in the Months field, store in NextCalDate.&nbsp; Then I have Set a Condition, Compare any data source where NextCalDate is less than (date when ...
    Posted to Developer Information (Forum) by ledlincoln on November 27, 2012
  • Re: Send Email Notification.

    This thread brings up a question I have had that is indirectly related.&nbsp; I have created some scheduled workflows similar to what you describe, which act on all list items, or a subset of them.&nbsp; Yet, unless I am missing something, these workflows must be started from one item in the list, even though it may not be particularly pertinent ...
    Posted to General Discussion (Forum) by ledlincoln on May 23, 2012
Powered by Community Server, by Telligent Systems